SBU Rocket Team

Completed

NASA Student Launch Initiative - Launched May 1st, 2025, reaching 4,700 feet altitude with full payload recovery

Overview

I was the Embedded Systems and Controls Engineer on the Stony Brook Rocket Team, the university's AIAA chapter, through NASA's Student Launch Initiative. Our 105-inch, 21-pound rocket reached 4,700 feet and placed 24th of 53 teams with full payload recovery.

On the vehicle side I owned motor selection and RockSim simulation, running the trajectory analysis that set our altitude target, and I coordinated launch-day assembly across sub-teams. On the payload side I built the telemetry system: a multi-threaded C++ pipeline on a resource-limited board that encoded flight data into APRS packets. I tracked down a memory leak in it and put mutex guards around shared state so the threads stopped corrupting each other's data.

Results

Altitude Precision

Achieved 4,700 feet against declared target of 5,100 feet, demonstrating design accuracy within competition constraints.

Payload Integration

Transported and recovered STEMNaut payload with telemetry data collection throughout flight.

Competition Results

Ranked 24th out of 53 teams in NASA SLI, meeting design freeze requirements and maintaining consistent aerodynamic properties from subscale to full-scale testing.

Gallery

Full-Scale Rocket

Full-Scale Rocket Assembled

Assembled Rocket

105-inch full-scale rocket ready for launch

Full-Scale CAD Model

CAD Design

Complete full-scale rocket design model

Development Process

Subscale Construction

Construction Phase

Building the subscale prototype

Completed Subscale Rocket

Subscale Complete

Finished subscale ready for test flight

Payload Systems

Payload System

Payload Integration

STEMNaut payload system testing

STEMNaut Capsule

STEMNaut Capsule

Scientific payload capsule design

Payload CAD Design

Payload CAD

Detailed payload compartment design

Lessons

Performance Metrics

Achieved 4,700 feet altitude (92% of 5,100 feet target) with 105-inch, 21-pound full-scale rocket maintaining design consistency from subscale testing.

Design Challenges

Experienced early parachute deployment due to softened shear pin holes from pre-launch demonstrations, missing descent time requirement.

Competition Standing

Placed 24th out of 53 teams in NASA SLI with successful payload recovery.

Built with

RockSim SolidWorks 3D Printing Machine Shop Power Tools Telemetry Systems
RockSim Simulation